![](https://www.hnk.com.tw/wp-content/uploads/台北市立體育館.jpg)
![](https://www.hnk.com.tw/wp-content/uploads/台北市立體育館2.jpg)
Taipei City Multipurpose Stadium- Phase I (Taipei Arena) basic information:
- LOCATION|Taipei
- OWNER|Public Works Department of Taipei City Government
- ARCHITECT|Archasia Design Group
- FLOOR COUNT|5 stories
- FACADE CONTRACTOR|Great Construction System Incorp.
- ROLE INVOLVED|Contractor Consultant
We have provided Great Construction System Incorp. the following services:
- A. Curtainwall and titanium roof system development.
- B. Structural calculation.