

Hua Lien Airport Terminal Expansion Phase I and Phase II basic Information
- LOCATION|Hualien
- OWNER|Environmental Protection Administration, Executive Yuan
- ARCHITECT|Taiwan Area National Expressway Engineering Bureau
- FLOOR COUNT|3 stories
- FACADE CONTRACTOR|Lin Yang Global (Phase I), Kuo Teng Construction (Phase II)
- ROLE INVOLVED|Contractor and General Contractor Consultant
We have provided Lin Yang Global Co. and Kuo Teng Construction the following services:
- A. Phase I Glass unitized curtainwall and skylight shop drawings and fabrication drawings.
- B. Phase II passenger gangway, observation platform and cargo transportation station shop drawings and fabrication drawings.
- C. Mockup shop drawing and fabrication drawings.
-
Structural calculation for the above items.