Hua Lien Airport Terminal Expansion Phase I and Phase II

2022-03-07

Hua Lien Airport Terminal Expansion Phase I and Phase II basic information:

  • LOCATION|Hualien
  • OWNER|Environmental Protection Administration, Executive Yuan
  • ARCHITECT|Taiwan Area National Expressway Engineering Bureau
  • FLOOR COUNT|3 stories
  • FACADE CONTRACTOR|Lin Yang Global (Phase I), Kuo Teng Construction (Phase II)
  • ROLE INVOLVED|Contractor and General Contractor Consultant

We have provided Lin Yang Global Co. and Kuo Teng Construction the following services:

  • A. Phase I Glass unitized curtainwall and skylight shop drawings and fabrication drawings.
  • B. Phase II passenger gangway, observation platform and cargo transportation station shop drawings and fabrication drawings.
  • C. Mockup shop drawing and fabrication drawings.
  • Structural calculation for the above items.