| a. Curtainwall system design main coordinator |
| b. Periodic station in site office to assist design related issues |
| c. Assist in shop drawing review meeting and drawing revisions |
| d. Assist and attend in mockup test assembly and tesing |
| e. Assist and attend in US acoustic test laboratory coordination, assembly and testing |
| f. Check the accuracy of the shop drawing and fabrication drawings for the entire project. |
| g. Entire project curtainwall structural calculation |
|